CITY COUNCIL AGENDA ITEM
Memo Date: December 1, 2022
Agenda Date: December 13, 2022
Prepared By: John Perrin, P.E., Senior Engineer
Through: John A. Walsh, P.E., Utilities Director
Requested Action:
title
To Approve Task Order 2023-07 with Atlantic Development of Cocoa, Inc. for Construction of the Sea Ray Drive Bridge 36-Inch Water Main Relocation Project; To Approve as a Multi-Year Contract; To Approve a Resolution Authorizing the City Manager to Approve and Execute Change Orders in an Amount Not To Exceed $439,952.35 (10% of the Contract Amount) for a Total Project Cost of $4,839,475.89; To Approve a Resolution Amending the FY2023 Budget, BAF 23-026-PT...End
body
BACKGROUND:
Brevard County (County) is currently in the process of designing the replacement of the Sykes Creek Bridge on Sea Ray Drive. This bridge was damaged during Hurricane Matthew in 2016, and the County has since determined that the bridge needs to be replaced. The City of Cocoa has a 36-inch water main aerial crossing that is attached to the existing bridge which will have to be relocated to accommodate County’s proposed bridge replacement project. The relocation will consist of the replacement of approximately 1,400 linear feet of water main, a significant portion of which will be directionally drilled under Sykes Creek, which will eliminate the conflict with the bridge replacement project, increase the reliability of a critical transmission pipe, and reduce vulnerability during future storm events.
Jacobs Engineering Group Inc. (Jacobs) performed the design and permitting services under Task Order 2022-22, and will perform the engineering services during construction (SDC) under Task Order 2023-29, pending City Council approval.
On September 16, 2022, the City of Cocoa solicited quotes for the Sea Ray Drive Bridge 36-Inch Water Main Relocation Project from three (3) continuing service contractors pre-qualified by the City of Cocoa Utilities Department under RFQ 20-18-COC City of Cocoa General Contractor - Utility Systems. The following responses were received:
• Atlantic Development of Cocoa, Inc. (Atlantic) - $4,399,523.54;
• Danus Utilities, Inc. - response of “No Bid”;
• Southern Underground Industries, Inc. - no response.
Staff is requesting City Council approval of Task Order 2023-07 with Atlantic for construction of the Sea Ray Drive Bridge 36-Inch Water Main Relocation Project as a multi-year contract.
Staff is also requesting that City Council approve an additional $439,952.35 as contingency for the project. The additional amount is 10% of the contract amount and will be used for change orders with approval by the City Manager. Although City staff does not anticipate change orders, with a project of this size there is always a possibility of unknown obstacles in the field that would require changes to the project. If a change order is needed, the additional amount will allow the project to continue forward while minimizing delays.
The additional $439,952.35 Construction Contingency Budget will not be added to the initial purchase order. Each change order will be reviewed by staff before it is sent to the City Manager for approval, and subsequently added to the purchase order.
Staff recommends approval of Task Order 2023-07 with Atlantic for construction of the Sea Ray Drive Bridge 36-Inch Water Main Relocation Project.
This project is partially funded in FY23. A Budget Adjustment Form (BAF) is necessary to allocate additional funding from Project Number WS1201 Account Number 424-4055-536.63-00 (Infrastructure) to Project Number WS21SC Account Number 424-4055-536.63-00 (Infrastructure).
Contractor Bid $4,399,523.54
Construction Contingency $439,952.35 (10%)
Total Project Cost: $4,839,475.89
STRATEGIC PLAN CONNECTION:
N/A
BUDGETARY IMPACT:
Budgeted: Partial
If not budgeted, is amendment/transfer attached? Yes
BAF#23-026-PT
Amount Requested: ($2,055,874)
Account Number: 424-4055-536.63-00, WS1201
Account Name: Infrastructure
Amount Requested: $2,055,874
Account Number: 424-4055-536.63-00, WS21SC
Account Name: Infrastructure
Total Request
Amount Requested: $4,839,475.89
Account Number: 424-4055-536.63-00, WS21SC
Account Name: Infrastructure
Source of Funds: Capital
TOTAL COST FOR MULTI-YEAR CONTRACT: $4,839,475.89
PREVIOUS ACTION:
On October 27, 2020, City Council awarded RFQ 20-18-COC, General Contractor - Utility Systems to Atlantic as one of the City of Cocoa’s Utilities General Construction Contractors, and authorized the City Manager to negotiate and execute the Agreement for Utilities General Construction Contractor with Atlantic.
On September 28, 2021, City Council approved Task Order 2022-22 with Jacobs to provide design and permitting services for the Sea Ray Drive Bridge 36-Inch Water Main Crossing Relocation Project.
RECOMMENDED MOTION:
Recommendation
To Approve Task Order 2023-07 with Atlantic Development of Cocoa, Inc. for Construction of the Sea Ray Drive Bridge 36-Inch Water Main Relocation Project; To Approve as a Multi-Year Contract; To Approve a Resolution Authorizing the City Manager to Approve and Execute Change Orders in an Amount Not To Exceed $439,952.35 (10% of the Contract Amount) for a Total Project Cost of $4,839,475.89; To Approve a Resolution Amending the FY2023 Budget, BAF 23-026-PT....End