File #: 24-548    Version: 1 Name:
Type: Agenda Status: Agenda Ready
File created: 9/11/2024 In control: City Council
On agenda: 10/8/2024 Final action:
Title: Approve a Piggyback Contract Agreement utilizing Palm Coast contract RFSQ-CD-20-31 with Connect Consulting, Inc. (CCI), High Springs, Florida for Professional Hydrogeological Services, Project No. WS1106 in an Amount Not to Exceed of $250,000 for FY 2025. Authorize the City Manager to Approve any Subsequent Annual Renewals under the above Palm Coast contract, not to exceed three one-year renewals with a Limited Renewal Amount of $250,000 for Each Fiscal Year Pending Palm Coast's Renewal of the Contract; Authorize the City Manager to Approve Task Orders Under this Contract
Attachments: 1. DOCUSIGNED 3rd RENEWAL - CCI - EXP 2-21-2025.pdf, 2. Cocoa FY 2025 Proposal.pdf, 3. RFSQ-CD-20-31 Project Manual with forms and sample contract (1).pdf, 4. Connect - MSA Professional Hydrogeological Services.pdf, 5. UT-DYAL-21-PGB-Connect-001-00.pdf, 6. Permission to piggyback.pdf, 7. Labor Rate Schedule - EXHIBIT C RFSQ-CD-20-31.pdf, 8. CCI COI Exp. 09.28.2025.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

CITY COUNCIL AGENDA ITEM

 

Memo Date:                                          September 11, 2024

Agenda Date:                     October 8, 2024

Prepared By:                                          James Mitchell, Water Treatment Manager

Through:                                          John A. Walsh, P.E., Utilities Director

Requested Action:                     

title

Approve a Piggyback Contract Agreement utilizing Palm Coast contract RFSQ-CD-20-31 with Connect Consulting, Inc. (CCI), High Springs, Florida for Professional Hydrogeological Services, Project No. WS1106 in an Amount Not to Exceed of $250,000 for FY 2025. Authorize the City Manager to Approve any Subsequent Annual Renewals under the above Palm Coast contract, not to exceed three one-year renewals with a Limited Renewal Amount of $250,000 for Each Fiscal Year Pending Palm Coast’s Renewal of the Contract; Authorize the City Manager to Approve Task Orders Under this ContractEnd

 

body

BACKGROUND:

 

On February 21, 2024, Connect Consulting, Inc. and the City of Palm Coast, Florida, executed the 3rd (Final) Renewal of RFSQ-CD-20-31, Professional Hydrogeological Services effective February 21, 2024 through February 21, 2025.

 

The City of Cocoa supplies water to customers in their service area from both ground and surface water sources. The surface water source consists of the Taylor Creek reservoir. The ground water sources consist of the Intermediate and Upper Floridian Aquifers (UFA). Ground water is developed from a series of 48 wells, the first of which were constructed in the 1950’s and are still in service today. In summary, the wells operated by the City consist of four (4) different types of wells as follows:

 

1.                     Screened gravel-packed wells completed into the Intermediate Aquifer

2.                     Moderate yield, open hole wells completed into the UFA

3.                     High yield, open hole wells completed into the UFA

4.                     Aquifer storage and Recover (ASR) wells

 

The City of Cocoa wells are permitted under the City’s Consumptive Use Permit (CUP) No. 50245 issued by the St. Johns River Water Management District (SJRWMD) in December 2022. As with all wells and wellfields, individual wells have a life cycle. Given the cost of new wells, including well site acquisition, CUP/water allocation issues, ground water impacts, well head/raw water piping costs, power and remote operation issues, periodic evaluation and rehabilitation/repair or replacement of existing wells is cost effective in extending a well’s life cycle.

 

The scope of work included in this proposal is a continuation of the wellfield evaluation and rehabilitation work and includes conducting evaluations on wells; modification and /or rehabilitation of wells; pump repair/replacement; and other well-specific tasks identified by City Staff during the fiscal year as needed. The primary and typical services that we propose to conduct include the following:

 

 

-                     Evaluation of Public Water Supply Wells

-                     Well Pump Evaluation, Repair, and Replacement

-                     Well Modification and/or Rehabilitation

-                     Removal of Well Pumps and Debris

-                     Instrumentation Installation

-                     Discharge Piping and Wellhead Upgraded

-                     USGS Monitoring Well C Initial Abandonment

These services are budgeted at $250,000 annually and are included in the Adopted Budget each year.

 

City staff recommends approval of this multi-year piggyback contract with Connect Consulting, Inc. (CCI), for hydrogeological services to conduct wellfield evaluations and to rehabilitate, repair, or replace wells as needed in order to maintain, restore, and enhance the reliability of wellfield production in an amount not to exceed $250,000 per year of the contract. This is the 3rd (final) Annual Renewal with Connect Consulting, Inc. Staff is also requesting authorization for the City Manager to approve all task orders under this contract.

 

 

 

 

STRATEGIC PLAN CONNECTION: 

 

N/A

 

 

BUDGETARY IMPACT:

 

Budgeted                                                                                                                                                   Yes

If not budgeted, is amendment/transfer attached?                     N/A

 

Amount Requested                                                                                                                              $250,000.00

Account Number                                                                                                                              424-4020-536.63-00, WS1106

Account Name                                                                                                                              Infrastructure

 

Source of Funds:                                                                                                                               Operating Revenue

 

 

 

 

PREVIOUS ACTION:

 

From 2011 through FY2020, City Council has approved the use of the City of Palm Coast Services Contract for Professional Hydrogeological Services with Connect Consulting, Inc.

 

On October 27th, 2020 Agenda 20-613 City Council approved the use of the City of Palm Coast Services Contract for Professional Hydrogeological Services with Connect Consulting, Inc.

 

RECOMMENDED MOTION:

Recommendation

Approve a Piggyback Contract Agreement utilizing Palm Coast contract RFSQ-CD-20-31 with Connect Consulting, Inc. (CCI), High Springs, Florida for Professional Hydrogeological Services, Project No. WS1106 in an Amount Not to Exceed of $250,000 for FY 2025. Authorize the City Manager to Approve any Subsequent Annual Renewals under the above Palm Coast contract, not to exceed three one-year renewals with a Limited Renewal Amount of $250,000 for Each Fiscal Year Pending Palm Coast’s Renewal of the Contract; Authorize the City Manager to Approve Task Orders Under this Contract