File #: 23-645    Version: 1 Name:
Type: Agenda Status: Agenda Ready
File created: 10/9/2023 In control: City Council
On agenda: 11/14/2023 Final action:
Title: Approve Participation in a Multi-Year Piggy-Back Agreement with Inliner Solutions for Cured in Place Pipe Lining Utilizing Volusia County's Contract # 22-B-41HO Effective November 14, 2023 through September 19, 2025. Authorize the City Manager to Approve a Task Order/Purchase Order to Inliner Solutions utilizing this piggy-back contract for Cured in Place Pipe Lining for $155,095 for 1,252 linear feet of pipe lining. Approve a Contingency Resolution Authorizing the City Manager to issue Change Order(s) not to exceed $4,905.
Attachments: 1. 102423 - Inliner Solutions - $155,095.pdf, 2. Construction Contingency Resolution.pdf, 3. Volusa County Stormwater Master Agreement 4140 (003).pdf, 4. Volusia County Contract Award 22-B-41HO; Recommendation of Award Volusia County.pdf, 5. PARTIALLY EXECUTED Standard Form for Piggyback Contract No 22-B-41HO.pdf, 6. SIGNED E-verify Affidavit.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
CITY COUNCIL AGENDA ITEM

Memo Date: October 9, 2023
Agenda Date: November 14, 2023
Prepared By: Frank Mirabito, Project Manager
Through: Abigail Morgan, Interim Public Works Director/City Engineer
Requested Action:
title
Approve Participation in a Multi-Year Piggy-Back Agreement with Inliner Solutions for Cured in Place Pipe Lining Utilizing Volusia County's Contract # 22-B-41HO Effective November 14, 2023 through September 19, 2025. Authorize the City Manager to Approve a Task Order/Purchase Order to Inliner Solutions utilizing this piggy-back contract for Cured in Place Pipe Lining for $155,095 for 1,252 linear feet of pipe lining. Approve a Contingency Resolution Authorizing the City Manager to issue Change Order(s) not to exceed $4,905.
End

body
BACKGROUND:

The City's drainage system is comprised of inlets, curbs, concrete and metal pipes, as well as open swales and ditches. Due to material interactions and soil conditions, over time metal pipe corrodes to the point that the pipe allows soil to enter the pipe, impeding stormwater flows. This can cause potential flooding and create subsidence issues.

The Cured-In-Place Pipe Lining process is a technique that involves installing a resin liner into the pipe, filling it with hot water that expands the liner and molds it to the inside of the pipe and cures it. This technique allows the pipe to be repaired without excavation for replacement, thus minimizing disruptions to residents and traffic.


STRATEGIC PLAN CONNECTION:

Objective 6.1.2: Maintenance and Operation of Public Stormwater Facilities. The City shall ensure that all stormwater management systems under the City's authority receive the proper levels of operation and maintenance necessary for the effective accomplishment of their intended water management functions.


BUDGETARY IMPACT:

Budgeted Yes
If not budgeted, is amendment/transfer attached? N/A

Amount Requested $160,000
Account Number _423-3570-538.63-00 SW08PL
Account Na...