File #: 24-696    Version: 1 Name:
Type: Agenda Status: Agenda Ready
File created: 12/2/2024 In control: City Council
On agenda: 12/10/2024 Final action:
Title: Approve a multi-year contract for cured in place stormwater pipe lining (CIPP) with Inliner Solutions, LLC piggybacking off the St. Augustine Beach Construction Agreement No. 23-07-MCA-ILS in the amount of $167,790. Authorize the City Manager to sign contract amendments, renewals and purchase orders up to the annual budgeted amount. Request Approval to Transfer Funds, BAF# 25-013-T in the amount of $7,790 From Stormwater Fund Contingency.
Attachments: 1. PARTIALLY EXECUTED Standard Form for Piggyback Contract No 23-07-MCA-ILS.pdf, 2. 110624 - Inliner CIPP Quote - $167,790.pdf, 3. BID 23-07 Unit Pricing Bid Tab.PDF, 4. St. Augustine Beach MCA 23-07 ILS_InlinerSolns - Executed -FINAL (1).pdf, 5. Bid 23-07 Bid Document.PDF, 6. BID 23-07 Bid Tab.PDF, 7. Addendum No. 1.PDF, 8. COI.pdf, 9. Commission Approved Award Recommendation.PDF, 10. Everify - Memo of Understanding .pdf, 11. Inliner Solutions, LLC SUBMITTAL.PDF, 12. PERMISSION Inliner_Bid 23-07_Cocoa_executed.pdf, 13. SIGNED E-Verify Contractor Affidavit.pdf, 14. BAF 25-013-T-PW-Cured in Place Pipe Lining (12-10-24) Agenda 24-696-FY25.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
CITY COUNCIL AGENDA ITEM

Memo Date: December 2, 2024
Agenda Date: December 10, 2024
Prepared By: Frank Mirabito, Streets & Stormwater Manager
Through: Abigail Morgan, P.E. - Public Works Director/City Engineer
Requested Action:
title
Approve a multi-year contract for cured in place stormwater pipe lining (CIPP) with Inliner Solutions, LLC piggybacking off the St. Augustine Beach Construction Agreement No. 23-07-MCA-ILS in the amount of $167,790. Authorize the City Manager to sign contract amendments, renewals and purchase orders up to the annual budgeted amount. Request Approval to Transfer Funds, BAF# 25-013-T in the amount of $7,790 From Stormwater Fund Contingency.
End

body
BACKGROUND:

The City's drainage system is comprised of inlets, curbs, concrete and metal pipes, as well as open swales and ditches. Due to material interactions and soil conditions, over time metal pipe corrodes to the point that the pipe allows soil to enter the pipe, impeding stormwater flows. This can cause potential flooding and create subsidence issues.

The Cured-In-Place Pipe Lining process is a technique that involves installing a resin liner into the pipe, filling it with hot water that expands the liner and molds it to the inside of the pipe and cures it. This technique allows the pipe to be repaired without excavation for replacement, thus minimizing disruptions to residents and traffic.

Funds were budgeted in Fiscal Year 2025. Some contingency funds are required to cover the shortfall and a BAF is being requested.

For future fiscal years, as this is an ongoing program to continually rehabilitate the City's stormwater infrastructure Staff also requests that City Council authorize the City manager to issue purchase orders through Fiscal Year 2027 with optional annual renewals through Fiscal Year 2029 up to the approved adopted budget amount in each year.


STRATEGIC PLAN CONNECTION:

Objective 6.1.2: Maintenance and Operation of Public Stormwater Facilities. ...