Title: To Approve Task Order 2020-14 with Bussen-Mayer Engineering Group, Inc. for Engineering Services During Construction (SDC) of the Michigan Avenue Force Main and Reuse Main Extension, Project No. WS17MI; To Approve as a Multi-Year Contract from FY2020 through FY2021
Attachments: 1. T.O. (2020-14) BUSSEN $52755.00 (12-03-2019) UT.pdf, 2. T.O. Proposal (2020-14) BUSSEN-MAYER $52,755.00 (12-03-2019) UT.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
CITY COUNCIL AGENDA ITEM

Memo Date: December 30, 2019
Agenda Date: January 22, 2020
Prepared By: Peter Davis, E.I., Associate Engineer I
Through: John A. Walsh, P.E., Utilities Director
Requested Action:
title
To Approve Task Order 2020-14 with Bussen-Mayer Engineering Group, Inc. for Engineering Services During Construction (SDC) of the Michigan Avenue Force Main and Reuse Main Extension, Project No. WS17MI; To Approve as a Multi-Year Contract from FY2020 through FY2021End

body
BACKGROUND:

The Utilities Department Engineering Division staff has identified the existing force main along U.S. Highway No. 1 as a single point of failure within the City of Cocoa wastewater collection system. A hydraulic model analysis of the wastewater collection system reveals a deficiency in this section which can be resolved by extending the force main from U.S. Highway No.1 to Clearlake Road creating a circular flow path. During design, it was determined to be beneficial in construction costs to incorporate a reclaimed water line extension into the same project. The goal is to increase operational flexibility in the wastewater collection system and to improve flow and pressure in the reclaimed system. The optimal scenario selected for design consists of the extension of 3,000 Linear Feet of 10-Inch PVC force main from U.S. Highway No.1 to Clearlake Road. This plan also includes the reuse main extension consisting of 123 Linear Feet of 4-inch PVC, 1310 Linear Feet of 6-inch PVC, and 210 Linear Feet of 12-inch DIP from U.S. Highway No.1 to Clearlake Road.

Staff is requesting City Council approval of Task Order 2020-14 with Bussen-Mayer Engineering Group, Inc. as a multi-year contract from FY2020 through FY2021 to provide engineering services during the construction phase of the Michigan Avenue Force Main and Reuse Main Extension, Project No. WS17MI. Under this task, Bussen-Mayer will attend a preconstruction conference with the applicable utilities companies, review an...

Click here for full text