Closed captioned livestreams and replays of all City of Cocoa City Council meetings can be found on the City's YouTube Channel. Simply click on the "CC" in the bottom right corner of the video.

File #: 21-572    Version: 1 Name:
Type: Resolution Status: Public Hearing
File created: 8/23/2021 In control: City Council
On agenda: 9/14/2021 Final action:
Title: Accept Stantec's FY 2021 Stormwater Rate Study Update and Approve the Final Stormwater Assessment Resolution # 2021-083, and the Non-Ad Valorem Assessment for Stormwater Utility Services, Fiscal Year 2022.
Attachments: 1. 2021-083 Final Stormwater Assessment Resolution.pdf, 2. Affidavit of Mailing Stormwater Assessment.pdf, 3. Stormwater Ad Proof.pdf, 4. CERTIFICATE to non-ad valorem assessment roll.pdf, 5. fy21_cocoa_stmwtr_final_report_20210908.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
CITY COUNCIL AGENDA ITEM

Memo Date: August 23, 2021
Agenda Date: September 14, 2021
Prepared By: Lora Howell, Deputy Finance Director
Through: Rebecca Bowman, MBA, CGFO, CGFM, Finance Director
Requested Action:
title
Accept Stantec's FY 2021 Stormwater Rate Study Update and Approve the Final Stormwater Assessment Resolution # 2021-083, and the Non-Ad Valorem Assessment for Stormwater Utility Services, Fiscal Year 2022.
End

body
BACKGROUND:

In 1992, the City of Cocoa established a Stormwater Utility Fee (City Ordinance, Sec. 22-85), to fund operating and capital projects and to maintain the City's drainage, ditches, swales, piping, inlets, manholes, and retention/detention ponds. At that time, a complete evaluation of all pervious and impervious surfaces, on non-residential and undisturbed parcels within the City limits, resulted in the development of a calculation inclusive of both surfaces. Residential properties assigned a Single-Family Unit (SFU) rate, for parcels, under 5 acres and residential properties over 5 acres were inclusive of a pervious surface component and multi-family residential units assigned the (SFU) rate per unit.

December of 2018, the City contracted with Stantec Consulting, to develop a 10-year financial plan for the Stormwater Fund. City Staff provided our consultant with audited FY 2018 financial information and the amended FY 2019 budget, to assist with the 10-year financial plan modeling. Mead and Hunt, one of the City's engineering firms, was simultaneously evaluating capital and water quality needs and developing a 10-year work plan for the stormwater utility, including new regulatory requirements for the Indian River Lagoon.

At the May 14, 2019 Stormwater Utility Workshop, Stantec presented to City Council a change in methodology on the calculation and collection of fees for the Stormwater Utility. Industry supports basing Stormwater rates on impervious surface only, and not including pervious surface in the calc...

Click here for full text