Title: To Approve Task Order 2023-07 with Atlantic Development of Cocoa, Inc. for Construction of the Sea Ray Drive Bridge 36-Inch Water Main Relocation Project; To Approve as a Multi-Year Contract; To Approve a Resolution Authorizing the City Manager to Approve and Execute Change Orders in an Amount Not To Exceed $439,952.35 (10% of the Contract Amount) for a Total Project Cost of $4,839,475.89; To Approve a Resolution Amending the FY2023 Budget, BAF 23-026-PT
Attachments: 1. COI-Atlantic Exp 4-18-23.pdf, 2. Contingency Resolution.pdf, 3. WS21SC Quote Tabulation Sheet.pdf, 4. Proposal Bid Submittal, 5. TO - ATLANTIC 2023-07 $4,399,523.54 (12-13-22) UT-ENGR.pdf, 6. Budget Resolution FY23.pdf, 7. BAF 23-026-PT-UT-SeaRay Bridge 36in Water Main (12-13-22) Agenda 22-661.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
CITY COUNCIL AGENDA ITEM

Memo Date: December 1, 2022
Agenda Date: December 13, 2022
Prepared By: John Perrin, P.E., Senior Engineer
Through: John A. Walsh, P.E., Utilities Director
Requested Action:
title
To Approve Task Order 2023-07 with Atlantic Development of Cocoa, Inc. for Construction of the Sea Ray Drive Bridge 36-Inch Water Main Relocation Project; To Approve as a Multi-Year Contract; To Approve a Resolution Authorizing the City Manager to Approve and Execute Change Orders in an Amount Not To Exceed $439,952.35 (10% of the Contract Amount) for a Total Project Cost of $4,839,475.89; To Approve a Resolution Amending the FY2023 Budget, BAF 23-026-PT.....End

body
BACKGROUND:

Brevard County (County) is currently in the process of designing the replacement of the Sykes Creek Bridge on Sea Ray Drive. This bridge was damaged during Hurricane Matthew in 2016, and the County has since determined that the bridge needs to be replaced. The City of Cocoa has a 36-inch water main aerial crossing that is attached to the existing bridge which will have to be relocated to accommodate County's proposed bridge replacement project. The relocation will consist of the replacement of approximately 1,400 linear feet of water main, a significant portion of which will be directionally drilled under Sykes Creek, which will eliminate the conflict with the bridge replacement project, increase the reliability of a critical transmission pipe, and reduce vulnerability during future storm events.

Jacobs Engineering Group Inc. (Jacobs) performed the design and permitting services under Task Order 2022-22, and will perform the engineering services during construction (SDC) under Task Order 2023-29, pending City Council approval.

On September 16, 2022, the City of Cocoa solicited quotes for the Sea Ray Drive Bridge 36-Inch Water Main Relocation Project from three (3) continuing service contractors pre-qualified by the City of Cocoa Utilities Department under RFQ 20-18-COC City o...