Closed captioned livestreams and replays of all City of Cocoa City Council meetings can be found on the City's YouTube Channel. Simply click on the "CC" in the bottom right corner of the video.

File #: 20-751    Version: 1 Name:
Type: Contract Status: Consent Agenda
File created: 10/23/2020 In control: City Council
On agenda: 11/10/2020 Final action:
Title: Approve Task Order 2020-17 and Amendment using the Continuing Services Agreement with Infrastructure Solution Services (ISS) for Engineering Design, Permitting and Construction Support Services of the sidewalk improvements project on Aurora Street for $66,293.00. Authorize the City Manager to execute the all agreements and issue the purchase order.
Attachments: 1. Aurora Street Sidewalk Improvements Project Task Order and Amendment.pdf, 2. Cocoa Aurora Road Drainage Improvements Project ISS Task Order 8-20-2020 FINAL.pdf, 3. Cocoa Aurora Street Drainage Improvements Project ISS Labor Breakdown Task Order 07-17-20 DRAFT.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
CITY COUNCIL AGENDA ITEM

Memo Date: October 23, 2020
Agenda Date: November 10, 2020
Prepared By: Abigail Morgan, P.E., Public Works Assistant City Engineer
Through: Bryant Smith III, P.E., CFM, Public Works Director/City Engineer
Requested Action:
title
Approve Task Order 2020-17 and Amendment using the Continuing Services Agreement with Infrastructure Solution Services (ISS) for Engineering Design, Permitting and Construction Support Services of the sidewalk improvements project on Aurora Street for $66,293.00. Authorize the City Manager to execute the all agreements and issue the purchase order. End

body
BACKGROUND:

Aurora Street, from State Road 520 to Jackson Street is a local roadway with no pedestrian facilities and utilizes open ditch stormwater conveyance on both sides of the roadway. This particular corridor has frequent pedestrian traffic that is forced onto the roadway to access the Central Brevard Sharing Center site, which is within this project's location. The Space Coast Area Transit Hub and Provost Park are also within one block of this project and contribute to the pedestrian traffic in this location. The lack of sidewalk connectivity creates an unsafe pedestrian environment and the piping of the ditch is necessary to construct ADA compliant sidewalks along the roadway.

The Aurora Street Sidewalk Improvements Project includes the installation of new sidewalks on both sides of Aurora Street from SR 520 to Jackson Street. Stormwater improvements, including stormwater inlets, piping, and other stormwater structures to replace the existing roadside ditches and driveway culverts are required to provide adequate space for the new sidewalks.

The City requested the professional services of Infrastructure Solution Services (ISS) to assist with this project. The Scope of Work is to provide the Engineering Services for the engineering design and permitting of the sidewalk and drainage improvements along this roadway.

A portion of this projec...

Click here for full text